Thu, Nov 12 2020 10:10 AM

Kandahar

Background image

Technical Survey Engineer

AIWDP is a joint project between Ministry of Rural Rehabilitation and Development (MRRD), Ministry of Agriculture and Livestock (MAIL) and Ministry of Energy and Water (MEW). MRRD will . . .

Sun, Nov 08 2020 9:08 AM

Kabul

Background image

Water Management Specialist

The Water Management Specialist will participate in the selection of the subproject’s sites, and in conducting the field surveys of the project sites in which candidate will be . . .

Sat, Oct 31 2020 3:07 PM

Kabul

Background image

Senior Survey Manager

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Senior Survey Manager. The incumbent . . .

Sat, Oct 31 2020 3:02 PM

Kabul

Background image

Senior Hydro-Geologist Assistant

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Senior Hydro-Geologist Assistant.

Sat, Oct 31 2020 12:14 PM

Kandahar

Background image

Regional Manager

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Regional Manager. The incumbents will be . . .

Sat, Oct 31 2020 12:12 PM

Nangarhar

Background image

Regional Manager

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Regional Manager. The incumbents will be . . .

Sat, Oct 31 2020 12:04 PM

Kabul

Background image

Senior Survey and Design Engineer

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Senior Survey and Design Engineer. The . . .

Sat, Oct 31 2020 12:00 PM

Laghman

Background image

WASH Officer

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring WASH Officer. The incumbent will be . . .

Mon, Oct 12 2020 1:56 PM

Badghis

Background image

Irrigation and water supply design engineer - (Reannounced)

To ensure that the projects are implemented with quality and planed objectives as per the project document, there is need for hiring an irrigation and water supply design engineer.

Wed, Oct 07 2020 1:44 PM

Kandahar

Background image

Survey Engineer

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Survey Engineer. The incumbent will be . . .

Wed, Oct 07 2020 10:26 AM

Kandahar

Background image

Irrigation Design Engineer

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Irrigation Design Engineer. The . . .

Wed, Oct 07 2020 10:20 AM

Kabul

Background image

Technical Contract Management Officer

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Technical Contract Management Officer. . . .

Wed, Oct 07 2020 10:04 AM

Laghman

Background image

Senior Irrigation Survey and Design Engineer

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Senior Irrigation Survey and Design . . .

Wed, Oct 07 2020 9:56 AM

Laghman

Background image

Senior Water Supply Survey and Design Engineer

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Senior Water Supply Survey and Design . . .

Mon, Oct 05 2020 9:37 AM

Baghlan, Kunduz

Background image

WASH Officer

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring WASH Officer. The incumbent will be . . .

Sun, Oct 04 2020 3:15 PM

Kabul

Background image

Cost Estimation/ Irrigation Design Engineer

The Cost Estimating/ Irrigation Design Engineer Will Calculating and determining of work volumes of irrigation, road and bridge, water supply designed subprojects and will be part of HQ . . .

Sun, Sep 20 2020 1:35 PM

Badghis

Background image

Project Officer - (Re-announced)

For ensuring the objectives set in the project document are being achieved through the planned activities in provinces, there is need for hiring Project Officer for dam.

Wed, Sep 02 2020 11:43 AM

Kabul

Background image

آفیسر مدیریت قرارداد های تخنیکی

بنابرین، غرض تآمین اطمینان برای برآورده ساختن اهداف و مقاصد پروژه با درنظر داشت فعالیت های پلان شده ضرروت به استخدام یک تن آفیسر مدیریت قرارداد های تخنیکی می باشد. بست مذکور برای پروژه . . .

Pagination