Handing over of a solar _powered water supply network in Paktika province

Ehsan_admin
Sat, Jun 13 2020 4:13 AM
پکتیکا

With the total cost of 5,2 million AFN , a solar powered water supply network has been recently completed and handed over through the Rural Water Supply  and Sanitation Program of MRRD in the Bokhan kheal village of Yusufkheal district of Paktika province.

This project included the digging of a deep water well with the length of 103 meters ,construction of a water reservoir with a capacity of 50 cubic meter, extension of a 5,671 meter long pipes, one surrounding for solar panels,110 water meters with all appliances and installation of 112 taps .

During the implementation of the mentioned project 240 working days were created and by it's construction 313 families and 295 students have gotten access to clean drinking water.

 

Latest news

Wed, Sep 23 2026 5:41 AM
Background image

معین امور آبادی دهات وزارت احیا و انکشاف دهات از دریای کنر دیدن نمود

بر اساس حکم ریاست‌ الوزراء امارت اسلامی افغانستان و فیصله معاونیت اقتصادی، وزرای محترم وزارت ‌های آب و انرژی، زراعت و مالداری، صنعت و تجارت، و الحاج محمد ارسلاح خروتی معین امور آبادی. . .

Mon, Aug 31 2026 6:43 AM
Background image

Coordination meeting held with representatives of institutions by the Ministry of Rural Rehabilitation and Development

A coordination meeting, led by His Excellency Al-Hajj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, was held this morning with representatives of. . .

Sun, May 17 2026 8:01 AM
Background image

The Honorable Minister of Rural Rehabilitation and Development met with the Ambassador of China and his accompanying delegation.

Honorable Alhaj Mullah Abdul Latif Mansoor, Minister of Rural Rehabilitation and Development, met today in his office with Mr. Zhao Xing, the Ambassador of China to Afghanistan, along. . .

BACK TO NEWS