Work progress of a water supply network construction project worth 3.2 million Afghanis in Sar-e Pol

Construction of a water supply network costing 3.2 million Afghanis will be completed soon by the Ministry of Rural Rehabilitation and Development (MRRD) in Takhta Kapruk village and Khanaghah, the provincial center of Sar-e-Pul province.
The network has a length of 2,505 km, a concrete iron storage with a capacity of 20 cubic meters, 20 solar panels and 182 water taps and meters. With its construction, 182 families will have access to safe drinking water.