Handing over of a water supply network construction project worth 4.6 million AFN in Balkh province

content_manager
Tue, Sep 22 2020 10:04 AM
تکمیل کار ساخت یک شبکه‌ی آبرسانی به ارزش ۴.۶ میلیون افغانی در بلخ

a water supply network construction project costing 4.6 million AFN has been recently completed and handed over by the National Water Supply and Sanitation Program of Ministry of Rural Rehabilitation and Development (MRRD) in Balkhabi village located in Nahr Shahi district of Balkh province.

The network included; a 150- meter deep water well, one concrete reservoir with 20 cubic meters capacity, 30 solar panels, a Surrounding wall, 3,580 km of pipeline and 80 water taps.

During the implementation of the mentioned project 110 working days were created and after its completion, 250 families, that most of them are internally displaced, have gotten access to safe drinking water.

Latest news

Wed, Sep 23 2026 5:41 AM
Background image

معین امور آبادی دهات وزارت احیا و انکشاف دهات از دریای کنر دیدن نمود

بر اساس حکم ریاست‌ الوزراء امارت اسلامی افغانستان و فیصله معاونیت اقتصادی، وزرای محترم وزارت ‌های آب و انرژی، زراعت و مالداری، صنعت و تجارت، و الحاج محمد ارسلاح خروتی معین امور آبادی. . .

Mon, Aug 31 2026 6:43 AM
Background image

Coordination meeting held with representatives of institutions by the Ministry of Rural Rehabilitation and Development

A coordination meeting, led by His Excellency Al-Hajj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, was held this morning with representatives of. . .

Sun, May 17 2026 8:01 AM
Background image

The Honorable Minister of Rural Rehabilitation and Development met with the Ambassador of China and his accompanying delegation.

Honorable Alhaj Mullah Abdul Latif Mansoor, Minister of Rural Rehabilitation and Development, met today in his office with Mr. Zhao Xing, the Ambassador of China to Afghanistan, along. . .

BACK TO NEWS