The Surveying process for the construction of 50 km protective wall across the Kuner River started

content_manager
Sat, Mar 16 2019 9:11 AM
Kunar

 The surveying process for the construction of 50 Km protective wall across the Kuner River has been started by the Technical surveying team of the Regional Program of the Rehabilitation and Development Ministry (MRRD).

By the construction of this wall, which will be built on a special order of the president, the agriculture lands will be protected and 5,200 hectares of the around land which were damaged by watersheds, can be planed and will increase the agricultural production and improves the economy of the locals.

Latest news

Wed, Sep 23 2026 5:41 AM
Background image

معین امور آبادی دهات وزارت احیا و انکشاف دهات از دریای کنر دیدن نمود

بر اساس حکم ریاست‌ الوزراء امارت اسلامی افغانستان و فیصله معاونیت اقتصادی، وزرای محترم وزارت ‌های آب و انرژی، زراعت و مالداری، صنعت و تجارت، و الحاج محمد ارسلاح خروتی معین امور آبادی. . .

Mon, Aug 31 2026 6:43 AM
Background image

Coordination meeting held with representatives of institutions by the Ministry of Rural Rehabilitation and Development

A coordination meeting, led by His Excellency Al-Hajj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, was held this morning with representatives of. . .

Sun, May 17 2026 8:01 AM
Background image

The Honorable Minister of Rural Rehabilitation and Development met with the Ambassador of China and his accompanying delegation.

Honorable Alhaj Mullah Abdul Latif Mansoor, Minister of Rural Rehabilitation and Development, met today in his office with Mr. Zhao Xing, the Ambassador of China to Afghanistan, along. . .

BACK TO NEWS