Two water supply projects handed over in center of Urozgan Province

content_manager
شنبه ۱۳۹۸/۶/۲۳ - ۴:۱۸
ارزگان

 At a total cost of 5,371,000 AFN, funded by UNICEF, two solar-powered water supply networks have been recently accomplished and handed over in “Sola” and “Shaheedan” villages in Tarinkot, the provincial capital of Urozgan province.
By the construction of these water supply networks, which were constructed by the Rural Water Supply and Sanitation Program (Ru-WatSP) of Ministry of Rural Rehabilitation and Development (MRRD), 450 families got access to clean drinking water.
The water supply network of “Sola” village was 4,350-meter long and it included a 32-cubic meter water reservoir and 150 taps; while the second network was 2,280-meter long and included a 32-cubic meter reservoir and 52 taps. It is worth mentioning that these projects were executed through the local Community Development Councils.

تازه ترین اخبار

یکشنبه ۱۴۰۵/۷/۵ - ۴:۳۲
Background image

کار ساخت یک پل در ولایت زابل آغاز شد

کار ساخت یک پل به طول (۴۰) متر در قریه جعفر علی خیل ولسوالی شاجوی ولایت زابل به مصرف (۱۷٫۵) میلیون افغانی توسط محترم الحاج مولوی عبدالرحمن حلیم معین مالی و اداری وزارت احیاء و انکشاف. . .

شنبه ۱۴۰۵/۷/۴ - ۹:۴۷
Background image

کار ساخت (۲،۰۸۹) کیلو مترسرک جغل‌ فرش در مربوطات ولسوالی علیشنگ ولایت لغمان آغاز شد

کار ساخت  (۲،۰۸۹)  کیلو متر سرک جغل‌ فرش از منطقه واینگل الی اولیا بالای ولسوالی علیشنگ ولایت لغمان به مصرف حدود (۲۰) میلیون افغانی توسط محترم الحاج محمد ارسلاح خروتی معین امور آبادی. . .

پنجشنبه ۱۴۰۵/۷/۲ - ۶:۱۳
Background image

معین امور آبادی دهات وزارت احیاء و انکشاف دهات از روند کار پروژه ‌های انکشافی در ننگرهار نظارت نمود

محترم الحاج محمد ارسلاح خروتی، معین امور آبادی دهات وزارت احیاء و انکشاف دهات، در جریان سفر کاری خود به ولایت ننگرهار، از روند کار شبکه آبرسانی در شهرک مهاجرین عودت‌کننده این ولایت و. . .

BACK TO NEWS