Work progress of a water supply network construction project costing 2,3 million AFN in Balkh

mrrd-admin
Mon, Nov 30 2020 9:16 AM
جریان کار ساخت یک شبکه‌ی آبرسانی به ارزش ۲.۳ میلیون افغانی در بلخ

With the total cost of 2,3 million AFN, construction of a water supply network has been 85% completed by the Citizens’ Charter National Priority Program of the Ministry of Rural Rehabilitation and Development in Hasan abad village located in Balkh district of Balkh province .

The network has a length of 1.43 km, a height reserve with a capacity of 23 cubic meters of water, 2 deep wells and 10 water taps.

. It is worth mentioning that during the work of this project, 700 working days have been created for technical and non-technical workers and with its completion, 250 families will gain access to safe drinking water.

Latest news

Mon, Aug 31 2026 7:43 AM
Background image

Coordination meeting held with representatives of institutions by the Ministry of Rural Rehabilitation and Development

A coordination meeting, led by His Excellency Al-Hajj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, was held this morning with representatives of. . .

Sun, May 17 2026 9:01 AM
Background image

The Honorable Minister of Rural Rehabilitation and Development met with the Ambassador of China and his accompanying delegation.

Honorable Alhaj Mullah Abdul Latif Mansoor, Minister of Rural Rehabilitation and Development, met today in his office with Mr. Zhao Xing, the Ambassador of China to Afghanistan, along. . .

Sun, May 10 2026 9:05 AM
Background image

A coordination meeting with representatives of institutions was held by the Ministry of Rural Rehabilitation and Development

The coordination meeting, led by respected Alhaj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, took place this morning with representatives of various. . .

BACK TO NEWS