The construction work of one water supply network begun in Laghman province

content_manager
Sun, Sep 15 2019 4:28 AM
لغمان

At a cost of AFNs 2.9 million funded by UNHCHR, the construction work of one water supply network begun through the Rural Rehabilitation and Development Department of Laghman in Now Abat Ali kheal village of Laghman province.
The network has a reservoir with 5 cubic meters capacity and a pipeline of 100 meters for water transfer and by its construction most of the local returnees will gain access to drinking water.

Latest news

Wed, Sep 23 2026 5:41 AM
Background image

معین امور آبادی دهات وزارت احیا و انکشاف دهات از دریای کنر دیدن نمود

بر اساس حکم ریاست‌ الوزراء امارت اسلامی افغانستان و فیصله معاونیت اقتصادی، وزرای محترم وزارت ‌های آب و انرژی، زراعت و مالداری، صنعت و تجارت، و الحاج محمد ارسلاح خروتی معین امور آبادی. . .

Mon, Aug 31 2026 6:43 AM
Background image

Coordination meeting held with representatives of institutions by the Ministry of Rural Rehabilitation and Development

A coordination meeting, led by His Excellency Al-Hajj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, was held this morning with representatives of. . .

Sun, May 17 2026 8:01 AM
Background image

The Honorable Minister of Rural Rehabilitation and Development met with the Ambassador of China and his accompanying delegation.

Honorable Alhaj Mullah Abdul Latif Mansoor, Minister of Rural Rehabilitation and Development, met today in his office with Mr. Zhao Xing, the Ambassador of China to Afghanistan, along. . .

BACK TO NEWS