The construction work of 8 km road begun in Laghman province

content_manager
Tue, Sep 17 2019 8:53 AM
لغمان

At a cost of AFNs 3.3 million the construction work of 8 Kilometers road begun through the National Rural Access Program of The Rural Rehabilitation and Development Ministry (MRRD) in Tag area located in Alinegar district of Laghman province.
By the construction of this road transportation problems of the residents will be solved. In the inauguration ceremony of the mentioned project, the Director of the Laghman Rural Rehabiliation and Development emphasized on the correct implementation of this road project.

Latest news

Wed, Sep 23 2026 5:41 AM
Background image

معین امور آبادی دهات وزارت احیا و انکشاف دهات از دریای کنر دیدن نمود

بر اساس حکم ریاست‌ الوزراء امارت اسلامی افغانستان و فیصله معاونیت اقتصادی، وزرای محترم وزارت ‌های آب و انرژی، زراعت و مالداری، صنعت و تجارت، و الحاج محمد ارسلاح خروتی معین امور آبادی. . .

Mon, Aug 31 2026 6:43 AM
Background image

Coordination meeting held with representatives of institutions by the Ministry of Rural Rehabilitation and Development

A coordination meeting, led by His Excellency Al-Hajj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, was held this morning with representatives of. . .

Sun, May 17 2026 8:01 AM
Background image

The Honorable Minister of Rural Rehabilitation and Development met with the Ambassador of China and his accompanying delegation.

Honorable Alhaj Mullah Abdul Latif Mansoor, Minister of Rural Rehabilitation and Development, met today in his office with Mr. Zhao Xing, the Ambassador of China to Afghanistan, along. . .

BACK TO NEWS