Does MRRD website solve your relevant questions?
This school has been completed in two building at a cost of USD two millions and 518 thousand through DIAG program in eight months and accommodates almost 1000 students. It is worth mentioning that, 68 different projects have been...
Based on the formal bi-lateral agreement, AIRD (Afghanistan Institute of Rural Development) facilitates the program for Afghan students particularly MRRD staff with a special discount. All of the interested candidates are requested to submit their...
These projects covers 52 Kilometers road, construction of 111 culverts, digging of 123 bore drinking water wells, construction of 3680 meters retaining walls, cleaning of 27688 meters fountain network, extension of 25145 meters urban electricity with...
This road implemented through Social Protection Department of Ministry of Rural Rehabilitation and Development (MRRD) with the contribution of 240 ton food through World Food Program (WFP) under the terms of food for work program, also the retaining...
These projects include repairing and gravelling of 3Km rural road, a culvert and 860m retaining walls, concrete and stone Canals with total length of 1477m, a siphon and irrigation structures in seven villages of Bagrami and Deh Sabz...
These projects contains repairing and gravelling of rural roads with total length of 31,341Km, 1229m retaining wall, 86 culverts, extension of water network length of 6180m with construction of a reservoir, 12 deep drinking water wells, construction...
The president of Afghanistan has talked about the extension of agriculture and education services and emphasized on protection of the projects which are implemented through Ministry of Rural Rehabilitation and Development and other entities. H.K...
These projects are comprise of rural roads with the total length of 6519m, construction of safe stone and concrete canals with the total length of 2430m, digging of ten bore drinking water wells and 40 meters retaining wall costing of AFN eight...
29 substruction and non-substruction projects which were implemented in past five years in Balkh, Bamyan and Kandahar Provinces, evaluated in a Seminar under the name of (Public Rural Development Project) through JICA Japan. The Seminar was...
The projects include drinking water, retaining walls, roads and culverts, canals and projects for women which of nine projects for Kandahar, six projects for Urozgan and two other will implement in Nimroz provinces with the total cost of AFN 32...
© e-Government of Afghanistan,
All rights reserved.